The project is invested by NBB and is planned and built through standard of high-class urban. It is located in Truong Quang Trong Ward, Quang Ngai City and is for the center of Quang Ngai City 1 km, the complex of Industry-Urban-Service VSIP Quang Ngai 5 km; it is locted in Highway 1A and Highway 24B so it is so convenient for transporttion. Within a radius of 800m from the project is the Thien An Mountain historic area and Tra Khuc Bridge was built with structural concrete passing to the river, creating a harmonious architectural space enviroment natural landscape.

Son Tịnh - Quang Ngai Residential is has model infrastructure, supply necessary demand about living, studying and etc, for resident of the Project and the sub-rounding. It is designed by UDEC Company which is Australian Leading about consulting and planning. Services of project include public service with hotels resorts, supermarket, market, schools, clinics, administrative center; link house and villas with total 2,965 lots; industrial area, landscape, sport center and etc. All services will generate luxury model living enviroment associated with nature. 
---
Scale:
- The urban residential area with functions and technical - economic indicators equivalent to the city of category III.

- Gross area:
1,026,963.00 m2
  + For public construction:
122,102.00 m2
  + For housing:
 404,601.00 m2
     . Adjacent houses (inc. 1,972 lots):
210,894.00 m2
     . Villas (inc. 413 lots):
133,143.00 m2
     . Resettlement houses (inc. 580 lots):
  60,593.00 m2
  + For trees, water space:
196,935.00 m2
  + For infrastructure land:
303,316.00 m2
- Total investment capital (provisional):
1,205.3bn VND

Progress:

-

The project was approved the detailed plan 1/500 in accordance with Decision No. 2155/QĐ-UBND dated 05/12/2008 by the People's Committee of Quang Ngai province and Decision No.1125/QĐ-UBND date 27/3/2014 by the People's Committee of Son Tinh District.
- People's Committee of Quang Ngai granted the Investment Certificate No. 34121000043 dated 6/3/2009 and the first Adjustment Investment Certificate No. 34121000043/GCNDDC1/34/1 dated 22/7/2013.
- The project published the project plan and handed over planning area boundaries to the investor on 28/3/2009.
- The basic design dossier was appraised by the Department of Construction of Quang Ngai Province. Board of Directors approves basic design and investment project.

- Completed 100% the clearance bomb.

- Until 31st December 2012, the project has finished the legal documents; the compensation reached about 86,8% and leveling reached 60% of project area, collecting material volumes such as culverts, tiles, curb reached about 50%.
- Until 31/12/2014, Project compensation has reached 74,5% over total area. In 2015, NBB will continue to implement and complete compensation, clearance and infrastructure construction.

- Expected to complete fully in 2016.

---
Map location



Drawings with the planning of land use:



Drawings with land use:


Drawings transportation planning:


---