It is invested by NBB. It is located in Ward 16, District 8, HCM City. The project's area is 4.15 ha; gross floor area is 264,707 m2. The project is expected to have 2 blocks including 21-28 floors (excluding 2 basements) with 1,470 apartments and a commercial center. Total investment amount is 2,675 billion VND, 20% of which is financed by NBB and 80% of which is financed by SII. Until 31 December 2010, this project has finished 92% land clearance, 65% leveling; the project's location has been accepted by People's Committee of HCMC; People's Committee of District 8 has approved the 1/500 zoning and Ministry of Construction has approved the base design documents and the project will start construction in the third quarter of 2011.
---
Size:
- Total area:
|
41.496,80 m2
|
+ For schools and kindergartens:
|
9.324,00 m2
|
+ For high-rise buildings:
|
10.130,00 m2
|
+ For landscapes and transport:
|
22.042,08 m2
|
- Total floor area (for high-rise buildings only):
|
227.299,97 m2
|
+ For apartments:
|
189.108,88 m2
|
+ For trade - service:
|
8.780,68 m2
|
+ For basement:
|
29.410,41 m2
|
- Storey (excluding a two-storey basement):
|
|
+ Apartments: 02 blocks with 28 stories each
|
|
+ Schools and kindergartens: a 3-storey school and a two-storey kindergarten
|
|
| - Total apartment volume (including 40 penthouses): |
1.470
|
- Population size (4 people per apartment on average):
|
5.880 people
|
- Total investment (temporary calculation):
|
2.675bn VND
|
- The rate of contribution to investment capital:
|
|
| + NBB: |
20%
|
| + SSI: |
40%
|
+ CII:
|
40%
|
Progress:
- Implemented the clearance compensation which reached 92% total area.
- Approved the detailed plan 1/500 on 21
st May 2010 by People's Committee of District 8.
- Approved transportation terminals, electricity supply, water supply and sewerage system.
- Responded to the basic design profile by Ministry of Construction.
- Expected to start construction in the end of Quarter III/2011.
---
Map location:
Drawings with:
|

With basement 1- 2
|

With ground floor
|
With typical floors 2
|
|

With typical floors 3 - 4
|

With typical floors 5
|

With typical floors
|
|

House type 1
|

House type 2
|

House type 3
|
---
This page is under realized
---
|

View of Diamond Riverside Project - Image 1
|

View of Diamond Riverside Project - Image 2
|
|
The status of land areas leveled - Image 1 (09/9/2009)
|

The status of land areas leveled - Image 1 (09/9/2009)
|