Print version

Organized and invested by BOT Rach Mieu Ltd., this project is lacated in the hedge of Tien Giang and Ben Tre province. Total capital requirement for this project was 1,311.61bn VND, in which: national capital contributed 60.4%, equivalent to 792.22bn VND; BOT capital was 39.6%, equivalent to 519.39bn VND; NBB financed 25% equivalent to 129.85bn VND. The project's pay-back period is 18 years and 5 months The project has opened to traffic and applied tolling on 02 April 2009. Total revenue in 2009 and 2010 was 40.19bn VND, increased by 14.05% and 70bn VND, increased by 28.44% comparing with business plan, respectively.
---

Scale:
- Total length of bridges and punctuation:     8.3 km
- Overview substantial breadth to face:         (2 +2 x3, 5 +2) m = 11m
- The rate of capital contributions by NBB:     25%
- Time charge:                                           13 years 
- Total investment:                                     1,311.61bn VND

Progress:
- Up to 20/8/2008: the rhythm of the long strike line, connecting the entire globe.
Have completed: carpet concrete to plastic surface, handrail installation, lighting system ....
- On 19/1/2009: inaugurated Rach Mieu Bridge

---

No information in this entry

---

No information in this entry

---